Northbeam Resume Co.

Sample intake, made-up client

Jordan Reyes, aiming for Project Manager

Jump to the brief

The resume Jordan uploaded
JORDAN REYES (fictional sample)
Columbus, OH | jordan.reyes@example.com

EXPERIENCE

Senior Project Coordinator, IT Project Office, Lakeview Health (fictional), 2021 to present
- Coordinated projects for the IT department
- Supported EHR upgrade
- Managed vendor communications
- Created status reports for leadership

Project Coordinator, IT Project Office, Lakeview Health (fictional), 2019 to 2021
- Scheduled meetings and took notes
- Maintained project documentation

Customer Service Representative, Brightline Insurance (fictional), 2016 to 2019
- Answered customer calls and resolved issues

EDUCATION
BA, Communications, 2016

SKILLS
Smartsheet, Microsoft Project, Jira, Excel, CAPM (in progress)
The coach's intake questions
1. What's the main reason you're looking to move on now?
2. Which accomplishment in your current role are you proudest of?
3. Are there titles or kinds of companies you want to target, or avoid?
4. Is there anything on your resume you're worried an employer will ask about?

The interview

Q1

From the coach's listWhy they're leaving.

What's the main reason you're looking to move on from Lakeview Health now?

Honestly a few things. I've basically been doing PM work for a while but the title is still coordinator and they won't move me up without a PMP, which I don't have yet. Also my director Karen is retiring in the spring and she's the one who's always gone to bat for me, so I don't know what it looks like after she leaves. And the commute downtown is like 50 minutes each way now that they moved our office, which isn't the main thing but it doesn't help lol.

Q2

From the coach's listThe accomplishment they're proudest of in their current role.

Which accomplishment in your current role at Lakeview Health are you proudest of?

Probably the Epic upgrade in 2023. It was a huge deal for the whole system, all four hospitals and the clinics. We pulled it off with basically no major issues at go-live, which everyone was kind of shocked by. There was a PM over the whole thing but it was a big team effort.

Q3

StoryJordan said "we" and "big team effort", so this asks where their own part started and stopped.

On the Epic upgrade, which part of the work was yours personally, apart from what the project manager and the rest of the team handled?

I mean I did a lot of the logistics. I set up the command center for go-live, like the schedule for all the super-users, who was covering which unit and which shift. And I built the issue tracker we used and ran the daily huddles after go-live for the first few weeks.

Q4

ProofJordan built the go-live command center schedule; this asks for its scale, which the resume leaves out.

How many super-users did the go-live schedule you built for the command center cover, across the four hospitals and clinics?

About 120 super-users, 24/7 for the first two weeks. That schedule was a nightmare honestly, people kept swapping shifts so I was redoing it constantly.

Q5

StoryCalled the schedule a nightmare; this asks how they kept every unit covered through the constant swaps.

How did you keep every unit and shift covered when people kept swapping shifts on that schedule?

I made a swap form so nobody could just text each other a trade, it had to come through me, and I kept a backup list of like 15 people who said they could fill in last minute. We never had a unit uncovered, which I was honestly pretty proud of.

Q6

From the coach's listWhich titles or companies they want to target.

Which kinds of titles or companies are you aiming for next?

Project Manager or IT Project Manager, ideally still healthcare since that's what I know. I'd avoid huge consulting firms where you travel all the time. A hospital system or a health tech company would be great. Hybrid would be amazing too, my sister just went fully remote at her insurance job and she will not stop talking about it lol.

Q7

From the coach's listWhat on the resume they worry an employer will ask about.

Is there anything on your resume that you're worried an employer will ask about?

Kind of the customer service job? It's three years that doesn't look related at all. And no PMP. I'm taking the CAPM in January but I know a lot of PM postings say PMP required.

Q8

StoryJordan said they ran the huddles; this asks how they decided to run them and how much was their own call.

How did you decide to run the daily huddles after go-live?

Honestly that wasn't really my decision, the huddles were part of the go-live plan. I just ran them. Every morning at 8 we'd go through the tracker, what was still open, who was on it. I kind of became the person who knew where everything was.

Q9

ProofJordan built the issue tracker and ran huddles, but gave no volume or resolution numbers yet.

How many issues did the tracker you built log during the first few weeks after go-live?

It was a Smartsheet everyone could submit to, anything broken or confusing in Epic. I sorted it every morning. I don't remember the exact numbers honestly, there were a ton of tickets the first week.

Q10

ProofJordan called it "a ton of tickets" but gave no number; this asks once for a rough range.

Even a rough guess is fine: about how many tickets came into that Smartsheet tracker during the first week after go-live?

If I had to guess, maybe 300 to 400 a day that first week? By the third week it was down to like 40 or 50 a day, and that's when we stopped doing the daily huddles.

Q11

StoryJordan gave a steep ticket decline; this asks what their own actions were in bringing it down.

Going from 300 to 400 tickets a day down to 40 or 50, what did you do that helped drive that drop?

I don't know that I drove it exactly, a lot of it is just people getting used to Epic. But I sorted everything each morning so the same issue didn't get worked five times, and I sent the training questions to the super-users instead of the analysts. Later I kind of pushed to stop the huddles, they were eating an hour a day for like 30 people, so I showed the PM the trend in the tracker and we went to twice a week.

Q12

Role gapProject manager hires look for vendor management; the resume lists it but no answer shows what Jordan did.

On the vendor side of the Epic upgrade, what was your own part in managing communications with the vendors?

On Epic it was mostly Epic's own team, I set up the calls and kept the action items. The bigger vendor thing was actually the clinic Wi-Fi refresh in 2022, that one was pretty much mine. 12 clinics. I did the schedule, worked with the vendor, coordinated with each clinic manager. We finished a couple weeks early.

Q13

Role gapProject manager hires look for budget evidence; the resume and answers show none for the Wi-Fi refresh.

Since the clinic Wi-Fi refresh was pretty much yours, what was the budget or vendor cost you were tracking across those 12 clinics?

I think it was around 300k? I tracked the invoices against it in Smartsheet but Karen approved the actual spend. Oh, I did catch the vendor billing us twice for one clinic, it was like 18 thousand, so that got credited back.

Q14

StoryJordan caught an $18k double bill; this asks how they found it, which shows their own attention to cost.

When the Wi-Fi vendor's double billing of about $18,000 came up, how did you spot it in your Smartsheet invoice tracking?

I had a row per clinic with the quote, and each invoice got matched to a row. One month two invoices landed on the same clinic, Westside I think, same amount, different invoice numbers. I flagged it to the vendor's account manager and Karen, and they credited it on the next bill.

Q15

Role gapProject manager hires look for leading people; the resume and answers show none yet.

Which people did you train, mentor, or guide at Lakeview Health, such as new coordinators or the super-users, and what did that look like?

Nobody reports to me officially. But I trained the three newer coordinators on our office, mostly they sat in on my meetings for a couple weeks and then ran the notes and tracker while I checked it. They still come to me with stuff before they go to Karen.

Q16

Role gapProject Manager hires look for a project owned start to finish; the Wi-Fi refresh is the closest so far.

Which project at Lakeview did you carry from kickoff to closeout, deciding the scope and timeline yourself?

The Wi-Fi one is the closest. Scope was set before I got it, 12 clinics and the vendor was already picked, but the timeline and the order of the clinics was all me. Besides that, not a full project, but I redid our weekly status report as a Smartsheet dashboard and now the whole office uses it for all our projects, I think around 25. Karen said it took her Monday prep from like three hours to half an hour.

Q17

StoryJordan's dashboard now serves about 25 projects; this asks how they won adoption beyond their own work.

When you redid the weekly status report as a Smartsheet dashboard, how did you get the rest of the office to start using it for their projects?

Some of the PMs hated it at first because it was one more thing. I sat with each of them for like 15 minutes the first time and filled it in with them, and I stopped asking for the old Word doc, so there wasn't a choice really lol. Greg, the loudest one, ended up showing it to his steering committee.

The coach's follow-up

Ask whether Jordan has presented to leadership or a steering committee themselves, and what from the customer service years carries over (volume, escalations, anything measurable).

Q18

The coach's follow-upWhether Jordan has presented to leadership or a steering committee themselves.

Have you presented to leadership or a steering committee yourself, apart from the status reports you created for them?

A couple times. When the Wi-Fi project was wrapping up I presented the closeout to the IT leadership meeting myself, like 10 minutes. And when Karen's out I run the Monday portfolio review off the dashboard, that's maybe once a month.

Q19

The coach's follow-upWhat from the customer service years carries over, since Jordan worries it looks unrelated.

What from your three years answering calls at Brightline do you still use when running projects?

Like 50 or 60 calls a day, claims mostly. The last year I was the one they sent the angry escalations to, and I trained new reps on the claims system. I guess staying calm when people are mad helps with PMs and clinic managers lol, I don't know if any of that matters.

The brief, as it landed in the coach's inbox

CLIENT: Jordan Reyes
AIMING FOR: Project Manager

WHAT THE RESUME UNDERSOLD

   Resume says: "Supported EHR upgrade"
   Interview found: On the 2023 Epic upgrade across four hospitals and the clinics, Jordan built the command center schedule for about 120 super-users covering 24/7 for two weeks, with no unit left uncovered. Jordan built the Smartsheet issue tracker and ran the daily huddles while tickets fell from about 300–400 to about 40–50 a day. Jordan then got the huddles cut to twice weekly.
   Source: Q3, Q4, Q5, Q8, Q10, Q11

   Resume says: "Managed vendor communications"
   Interview found: Jordan ran the 2022 Wi-Fi refresh across 12 clinics, owning the vendor relationship and the schedule, and finished about two weeks early. Jordan tracked about $300,000 in invoices and caught an approximately $18,000 duplicate charge that was credited back.
   Source: Q12, Q13, Q14, Q16

   Resume says: "Created status reports for leadership"
   Interview found: Jordan rebuilt the status report as a Smartsheet dashboard now used office-wide for about 25 projects, which cut the director's Monday prep from about 3 hours to 30 minutes. Jordan runs the Monday portfolio review about monthly and presented the Wi-Fi closeout to IT leadership.
   Source: Q16, Q17, Q18

   Resume says: "Coordinated projects for the IT department"
   Interview found: Jordan effectively ran the 12-clinic Wi-Fi refresh, setting its timeline and sequencing, and trained the office's three newer coordinators.
   Source: Q12, Q15, Q16

   Resume says: "Answered customer calls and resolved issues"
   Interview found: Jordan handled 50 to 60 claims calls a day, was the designated escalation handler in the final year, and trained new reps on the claims system.
   Source: Q19

YOUR QUESTIONS

1. What's the main reason you're looking to move on now?
   Jordan is doing PM work under a coordinator title and won't be promoted without a PMP. Jordan's director and advocate, Karen, retires in the spring. The office move also made the commute about 50 minutes each way, though that is a minor factor.
   Source: Q1

2. Which accomplishment in your current role are you proudest of?
   The 2023 Epic upgrade across all four hospitals and the clinics. Jordan ran the go-live command center scheduling and the issue tracker and huddles, and the go-live had basically no major issues.
   Source: Q2, Q3

3. Are there titles or kinds of companies you want to target, or avoid?
   Jordan is targeting Project Manager or IT Project Manager roles, ideally in healthcare at a hospital system or health tech company, and would prefer hybrid work. Jordan wants to avoid large consulting firms with heavy travel.
   Source: Q6

4. Is there anything on your resume you're worried an employer will ask about?
   Jordan worries that the three years in customer service look unrelated, and that many PM postings require a PMP, which Jordan doesn't have. Jordan is taking the CAPM in January.
   Source: Q7 and their resume
Summary, facts, and what's still open
SUMMARY (confirmed by the client)
You are a Senior Project Coordinator in the IT Project Office at Lakeview Health (2021 to present), after two years as Project Coordinator there and three years in customer service at Brightline Insurance. You are aiming for Project Manager or IT Project Manager roles, ideally in healthcare at a hospital system or health tech company, and you would prefer hybrid work. On the 2023 Epic upgrade across four hospitals and the clinics, you built the go-live command center schedule for about 120 super-users covering 24/7 for the first two weeks. You set up a swap form and a backup list of about 15 people, and no unit was ever left uncovered. You built the Smartsheet issue tracker and ran the 8 a.m. daily huddles after go-live. You estimate tickets went from about 300 to 400 a day in the first week to about 40 to 50 a day by week three. Using the tracker trend, you got the hour-long huddles for about 30 people cut from daily to twice a week. You ran the 2022 Wi-Fi refresh across 12 clinics. You set the timeline and clinic order, worked with the vendor and each clinic manager, and finished a couple of weeks early. You tracked invoices against a budget of about $300,000 and caught a duplicate vendor charge of about $18,000, which was credited back. You also presented the closeout to IT leadership. You rebuilt the office's weekly status report as a Smartsheet dashboard that is now used for about 25 projects, and Karen said it cut her Monday prep from about three hours to half an hour. You run the Monday portfolio review about once a month when Karen is out. You trained the three newer coordinators. At Brightline you handled 50 to 60 claims calls a day, took the escalated calls in your last year, and trained new reps on the claims system. You are taking the CAPM in January.

FACTS

1. Epic go-live command center staffing
   For the 2023 Epic upgrade across all four Lakeview hospitals and the clinics, Jordan set up the go-live command center and built the super-user coverage schedule, assigning who covered which unit and shift.
   Their part: Jordan built and kept rebuilding the schedule. Jordan created a swap form so every shift trade came through them, and kept a backup list of about 15 people who could fill in at short notice.
   Result: Jordan reports no unit was ever left uncovered.
   Number: About 120 super-users covered 24/7 for the first two weeks, with a backup pool of about 15. (how they know: Jordan's recollection; no report cited.)
   Note: A separate PM led the overall Epic upgrade; Jordan described it as a big team effort.
   Note: Jordan's claim of 'basically no major issues at go-live' has no stated measure.
   Source: Q2, Q3, Q4, Q5 and their resume

2. Post-go-live issue tracker and daily huddles
   Jordan built the Smartsheet issue tracker that anyone could submit Epic problems to, sorted it every morning, and ran the 8 a.m. daily huddles reviewing open items and owners for the first few weeks after go-live.
   Their part: Jordan built the tracker and triaged it daily so the same issue wasn't worked several times. Jordan routed training questions to super-users rather than analysts, and ran the huddles. The huddles themselves were part of the go-live plan, not Jordan's decision.
   Result: Ticket volume fell over the first three weeks. Jordan attributes much of the drop to users getting used to Epic and does not claim to have driven it.
   Number: About 300 to 400 tickets a day in week one, down to about 40 to 50 a day by week three. (how they know: Jordan's rough estimate from memory; the Smartsheet tracker may hold actual counts.)
   Note: Do not state that Jordan's triage caused the drop.
   Note: Figures are estimates, not pulled from the tracker.
   Source: Q3, Q8, Q9, Q10, Q11 and their resume

3. Cut daily huddles using tracker data
   Jordan pushed to scale back the post-go-live huddles and showed the PM the ticket trend from the tracker. The huddles then moved from daily to twice a week.
   Their part: Jordan made the case using tracker data; the PM agreed to the change.
   Result: The huddles went from daily to twice weekly around week three.
   Number: The huddles had taken about an hour a day for about 30 people. (how they know: Jordan's estimate.)
   Source: Q10, Q11

4. Clinic Wi-Fi refresh, 12 clinics
   In 2022 Jordan ran the Wi-Fi refresh across 12 Lakeview clinics. Jordan set the schedule and the order of clinics, worked with the vendor, and coordinated with each clinic manager. Jordan presented the closeout to the IT leadership meeting, about 10 minutes.
   Their part: Jordan owned the timeline and clinic sequencing, the vendor coordination, and the clinic-manager coordination. Jordan tracked invoices against budget in Smartsheet. Scope and vendor were set before Jordan took it on, and Karen approved the spend.
   Result: The project finished a couple of weeks early.
   Number: 12 clinics; budget about $300,000; finished about two weeks early. (how they know: Jordan's recollection; the budget figure was given as 'around 300k'.)
   Note: Jordan tracked the budget but did not hold approval authority.
   Note: Scope and vendor were predetermined.
   Note: Planned versus actual dates were not given.
   Source: Q12, Q13, Q16, Q18 and their resume

5. Caught duplicate vendor billing
   While matching Wi-Fi vendor invoices to per-clinic quote rows in Smartsheet, Jordan noticed two invoices on one clinic with the same amount and different invoice numbers. Jordan flagged it to the vendor's account manager and Karen.
   Their part: Jordan designed the invoice-matching tracker, spotted the duplicate, and raised it.
   Result: The vendor credited the charge on the next bill.
   Number: About $18,000 credited. (how they know: Jordan's recollection; the clinic was possibly Westside.)
   Source: Q13, Q14

6. Status report rebuilt as office-wide dashboard
   Jordan replaced the office's weekly Word status report with a Smartsheet dashboard that the whole IT Project Office now uses across its projects.
   Their part: Jordan designed the dashboard. Jordan drove adoption by sitting with each PM for about 15 minutes to fill it in the first time, and by no longer accepting the Word doc. Some PMs initially resisted. Greg, the most vocal, later showed it to his steering committee.
   Result: The whole office adopted it for all its projects, and the director's Monday prep time dropped.
   Number: About 25 projects; Karen's Monday prep went from about 3 hours to about 30 minutes. (how they know: Project count is Jordan's estimate; the time savings are what Karen told Jordan.)
   Source: Q16, Q17 and their resume

7. Runs portfolio review in director's absence
   When the director is out, Jordan runs the Monday portfolio review off the dashboard.
   Their part: Jordan leads the meeting.
   Number: About once a month. (how they know: Jordan's estimate.)
   Note: The attendees and size of the review were not given.
   Source: Q18

8. Trained newer coordinators
   Jordan trained the three newer coordinators in the IT Project Office. They sat in on Jordan's meetings for a couple of weeks, then ran the notes and tracker while Jordan checked their work.
   Their part: Jordan designed and delivered the informal onboarding.
   Result: The coordinators still bring questions to Jordan before going to the director.
   Number: 3 coordinators. (how they know: Jordan's account.)
   Note: Jordan has no formal direct reports.
   Source: Q15

9. Customer service volume, escalations, and training
   At Brightline, Jordan handled mostly claims calls. In the final year Jordan was the designated handler for angry escalations and trained new reps on the claims system.
   Their part: Jordan handled calls and escalations and trained new reps.
   Number: 50 to 60 calls a day. (how they know: Jordan's recollection.)
   Note: The number of reps trained was not given.
   Source: Q19 and their resume

STILL OPEN
- Can Jordan pull actual ticket counts from the Epic go-live Smartsheet tracker to replace the 300–400 and 40–50 a day estimates?
- Is there any measure behind 'basically no major issues at go-live' on the Epic upgrade, such as an incident count or downtime?
- What were the planned and actual completion dates for the 2022 clinic Wi-Fi refresh, to firm up 'a couple weeks early'?
- What was the exact budget for the Wi-Fi refresh (Jordan said around $300k), and did it finish on or under budget?
- Which clinic was double-billed (Jordan thought Westside), and what was the exact credited amount (about $18,000)?
- Exactly how many projects run on the status dashboard (Jordan estimated about 25), and how many PMs did Jordan onboard to it?
- Who attends the Monday portfolio review Jordan runs, and how many projects does it cover?
- How many new reps did Jordan train at Brightline?
- What is the date of Jordan's CAPM exam in January, and does Jordan plan to pursue the PMP after it?

Jordan and Northbeam Resume Co. are made up, and we typed Jordan's answers. The questions, the notes on why each was asked, and the brief are the interview's own, unedited.

powered by Gupler